Kwamtoro Nickel Project · Tanzania

From laterite resource to battery-supply opportunity.

A resource-gated exploration and modular processing strategy designed to create a practical pathway to Mixed Hydroxide Precipitate production.

Exploration foundation

A coherent nickel-laterite target in central Tanzania.

The Kwamtoro asset is located in Kondoa District, Dodoma Region, under Prospecting Licence PL 13650/2025.

SGS Tanzania soil assays identify a coherent nickel-cobalt- chromium-iron geochemical signature over interpreted ultramafic host geology. The project is in early exploration, with trenching, auger drilling, mineralogy, and follow-up technical work planned to test the anomaly.

Exploration results and targets are conceptual. Insufficient work has been completed to estimate a Mineral Resource, and there is no certainty that further exploration will result in one.

The product pathway

Why Mixed Hydroxide Precipitate?

MHP is a nickel-cobalt intermediate produced through hydrometallurgical processing of laterite ore. It provides a pathway into nickel-sulphate and cathode-material supply chains.

01

Laterite mining

Shallow, free-dig ore developed in staged mining campaigns.

02

Feed preparation

Scrubbing, classification, and blending for consistent leach feed.

03

Leaching

Atmospheric or pressure-leach pathways selected through test work.

04

Purification

Counter-current washing and impurity removal.

05

Precipitation

Nickel and cobalt recovered as mixed hydroxide.

06

MHP product

A battery-chain intermediate for further refining.

Resource-gated roadmap

Validate first. Scale with confidence.

Each phase is designed to reduce geological, metallurgical, regulatory, and commercial uncertainty before larger capital commitments.

Phase 01

Validate

  • Trenching and auger drilling
  • Mineralogy and metallurgy
  • Qualified technical oversight
Phase 02

Define resource

  • Systematic drilling
  • Independent resource work
  • Pre-feasibility assessment
Phase 03

Pilot & feasibility

  • Leach pilot program
  • Definitive feasibility study
  • Permits, financing, and offtake
Phase 04

Modular production

  • Commission initial module
  • Qualify MHP product
  • Expand with validated demand

Tanzania execution advantage

Build from an existing mineral economy.

Local supply base

Existing nickel ore activity, contractors, logistics, and regional mining expertise provide a practical operating base.

Brownfield-first options

Existing pits, roads, and small-scale industrial production can support a staged route while Kisma defines its own resource.

Modular processing

Atmospheric-leach and heap-leach concepts can be tested at an appropriate scale before any full-scale pressure-leach investment.

Permitting pathway

Processing and environmental work is being advanced in parallel with exploration and technical validation.

Long-term ambition

35,000 tonnes per year of MHP.

This production target is an aspirational development case, not a current production forecast. It remains subject to resource definition, metallurgical performance, feasibility, permits, financing, construction, commissioning, and market agreements.